Make your own free website on Tripod.com

co_at_alleghany.jpg

General Track Arrangement
HOME
Alleghany Station
"A" Cabin
Tunnels
Turntable - Operational Routine
CTC at "A" Cabin
Maps - Track Charts
Bibliography - Links
This is the general track arrangement in 1945. The operational routine became much simpler in the diesel era alleviating the need for as much trackwork. The westbound passing track was taken up in the mid-1970s, as was the trackage through the westbound Lewis Tunnel.
 
For a more detailed view of each section, click on the following links:
 
Section A        Section B        Section C        Section D
 

general_arrangement_top.jpg